空壓機(jī)的停用在各個(gè)單位都常有發(fā)生。那么在初次開機(jī)前空壓機(jī)停放時(shí)間超過(guò)三個(gè)月或空壓機(jī)停用時(shí)間超過(guò)三個(gè)月,再次開機(jī)前需要采取有效措施,bi須先請(qǐng)專業(yè)空壓機(jī)人員對(duì)機(jī)器進(jìn)行保養(yǎng)檢測(cè),制定安全措施,避免開機(jī)后發(fā)生不良狀況。
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先檢查電路狀態(tài),是否正常供電,電壓是否穩(wěn)定;測(cè)量電動(dòng)機(jī)絕緣電阻,數(shù)值大于1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢查空壓機(jī)配件上是否含有積水,灰塵,及時(shí)清理。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對(duì)進(jìn)氣口,出氣口全面檢測(cè),防止發(fā)生堵塞現(xiàn)象
3. Overall inspection of intake and outlet to prevent blockage
4、在上述都已經(jīng)完成的情況可以接通電源,查看電腦控制器是否正常運(yùn)行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換三濾和潤(rùn)滑油。因?yàn)樵陂L(zhǎng)期不用的情況下,三濾,油可能發(fā)生老化現(xiàn)象,從而造成空壓機(jī)開機(jī)運(yùn)行時(shí)間不長(zhǎng)即結(jié)膠積碳或堵塞,油路不暢使空壓機(jī)主機(jī)或其他零部件損壞。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業(yè)人員試機(jī),電路改造后人工控制加載卸載,先空載運(yùn)行10分鐘以上,檢測(cè)各項(xiàng)指標(biāo)和震動(dòng)、噪音等正常,再進(jìn)行加載,查看各部件運(yùn)行正常即可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先檢查電路狀態(tài),是否正常供電,電壓是否穩(wěn)定;測(cè)量電動(dòng)機(jī)絕緣電阻,數(shù)值大于1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢查空壓機(jī)配件上是否含有積水,灰塵,及時(shí)清理。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對(duì)進(jìn)氣口,出氣口全面檢測(cè),防止發(fā)生堵塞現(xiàn)象
3. Overall inspection of intake and outlet to prevent blockage
4、在上述都已經(jīng)完成的情況可以接通電源,查看電腦控制器是否正常運(yùn)行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換三濾和潤(rùn)滑油。因?yàn)樵陂L(zhǎng)期不用的情況下,三濾,油可能發(fā)生老化現(xiàn)象,從而造成空壓機(jī)開機(jī)運(yùn)行時(shí)間不長(zhǎng)即結(jié)膠積碳或堵塞,油路不暢使空壓機(jī)主機(jī)或其他零部件損壞。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業(yè)人員試機(jī),電路改造后人工控制加載卸載,先空載運(yùn)行10分鐘以上,檢測(cè)各項(xiàng)指標(biāo)和震動(dòng)、噪音等正常,再進(jìn)行加載,查看各部件運(yùn)行正常即可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.